Month: February 2023
-
The firehose has arrived in Building 24
Early this week the eagerly awaited 100 Gbit/sec network connection has arrived in Building 24 to be able to connect the on campus resources with the world at the 100 Gbit/sec level. The connection before was at the 10 Gbit/sec level. It turns out that the fibre ends up directly in the main network hub…
